April 3: Pebbles set in mud.
 |
April 3: Pebbles setting and waiting...
 |
April 3: Erin hanging out by the just-cut post (soon to be a lamp).
 |
April 4: Getting ready to grout.
 |
April 4: Grout on!
 |
April 4: Starting the clean the grout.
 |
April 4: Grouting finished!
 |
April 8: First wildflower blooming on the property.
 |
April 14: Erin checks out the pile of blinds to be installed.
 |
April 14: Installers working on the blinds in the greatroom.
 |
April 14: Blinds in the master bedroom, and...
 |
April 14: in the master bath.
 |
April 17: Mary hanging out in the sunshine.
 |
April 17: Mica, crashed out in the sunshine.
 |
April 17: Cool looking clouds over the mountains as we watch.
 |
April 25: Local solar noon, extent of sun on the Trombe walls now.
 |
April 25: Local solar noon, extent of sun in the greatroom
 |
April 26: Working on the ECS - learning about the float switch from
Jonas.
 |