Living Photos 6
Taken 3, 4, 8, 17, 25 & 26 April 2004


    Notes: Work begins on the final bits of tile in the master bath, blinds get installed and some landscaping work starts.
 
April 3: Pebbles set in mud. 
April 3: Pebbles setting and waiting...
April 3: Erin hanging out by the just-cut post (soon to be a lamp).
April 4: Getting ready to grout.
April 4: Grout on!
April 4: Starting the clean the grout. 
April 4: Grouting finished!
April 8: First wildflower blooming on the property. 
April 14: Erin checks out the pile of blinds to be installed.
April 14: Installers working on the blinds in the greatroom.
April 14: Blinds in the master bedroom, and...
April 14: in the master bath. 
April 17: Mary hanging out in the sunshine.
April 17: Mica, crashed out in the sunshine. 
April 17: Cool looking clouds over the mountains as we watch.
April 25: Local solar noon, extent of sun on the Trombe walls now. 
April 25: Local solar noon, extent of sun in the greatroom
April 26: Working on the ECS - learning about the float switch from Jonas.