Living Photos 7
Taken 2, 9 & 20 May 2004


    Notes: Landscaping work has begun in earnest.
 
May 2: Wiring the ECS sensor -- and it worked!
May 2: Digging to lay the wire for the ECS. We seeded it next, which didn't change the look of the sand much. 
May 9: Work continues on the courtyard.
May 9: View out from the courtyard; note two big aspens up on the berm and the noble fir. 
May 9: Mary planting aspen as Erin watches. John was doing the drip system and taking photos. :-)
May 20: Fresh grass coming up on the ECS.
May 20: Courtyard in the early morning with new trees and 8000 pounds of rocks waiting to be moved around.
May 20: Small plantings in the courtyard. 
May 20: View of the aspen trees in the courtyard.
May 20: Plants at the entry to the courtyard.
May 20: Plants on top of the courtyard wall. 
May 20: Drip system and associated stuff. 
May 20: Drip box one, zones 1 through 4, 1 singal is wired through the ECS switch.
May 20: Zones 5, 6 and the drain.