May 2: Wiring the ECS sensor -- and it worked!
 |
May 2: Digging to lay the wire for the ECS. We seeded it next, which
didn't change the look of the sand much.
 |
May 9: Work continues on the courtyard.
 |
May 9: View out from the courtyard; note two big aspens up on the berm
and the noble fir.
 |
May 9: Mary planting aspen as Erin watches. John was doing the drip
system and taking photos. :-)
 |
May 20: Fresh grass coming up on the ECS.
 |
May 20: Courtyard in the early morning with new trees and 8000 pounds
of rocks waiting to be moved around.
 |
May 20: Small plantings in the courtyard.
 |
May 20: View of the aspen trees in the courtyard.
 |
May 20: Plants at the entry to the courtyard.
 |
May 20: Plants on top of the courtyard wall.
 |
May 20: Drip system and associated stuff.
 |
May 20: Drip box one, zones 1 through 4, 1 singal is wired through
the ECS switch.
 |
May 20: Zones 5, 6 and the drain.
 |