Living Photos 8
Taken May 23, 30, 31 and June 4, 9 and July 4, 2004


    Notes:  Work on the ourdoor spaces continues, especially the sanctuary and courtyard.
 
May 23: A big hole for the bristlecone pine. And some big rocks pulled out.

May 23: Erin helps out with the landscaping.

Mary30:  Trenching around for the drip lines
May 30:  Continuing the trench.

May 30: Trench around the south end.

May 30: And on around.

May 30: The end of the trench at the ECS. No fence yet, the bunnies are still enjoying the salad bar at this point.

Mary 30: Mary checking out the subalpine firs.

May 31: John trenching out the ECS sensor wire in the hot sun....

May 31: ... as Mica knows the better place to hang out (nice soft dirt).

June 4: Erin watches over the new spruce bushes (snow still on Mt. Rose).

June 9: A midsummer's rain ... gotta think about harvesting this otherwise wasted water....

June 9: The effect of the summer rain.

July 4: Blooms around the courtyard.

July 4: Closeup of the campfire.

July 4: Closeup of the blooms along the garage wall.