PV Installation Photos 1
Taken 2, 3 & 6 June 2005


    Notes:  Ok, we're on our way, finally in the ground. Gotta get moving. Dirt moving took a day. Steel another day and fially we poured concrete. Assistance from Dave and Sean of Scott Meek and Son Concrete. These should sit about 21 days to let the concrete cure before we start loading them a lot.
 
June 2: The first cuts in the dirt for the north array.

June 2: Almost done with the hole for the first pier.

June 2: Second pier had a huge rock in it...

June 2:  But the littel Bobcat got it out! That was most of the hole

June 3: After bending all the steel we started tying it together.

June 3:  Almost got the first cage done. Lots of little things to do.

June 3: Getting it wrapped up. Dave (right) could tie steel fater than anyone I've ever seen.

June 6: Steel in, conduit in, bolts in. Ready for mud.

June 6: Mud coming!

June 6: First mud in the hole!

June 6: About halfway full of mud.

June 6: Dave starting to smooth off the concrete.

June 6: Sean and Dave working the top of the north pier.

June 6:  Mud going in the south pier.

June 6: Finishing off the top.

June 6: A view of both piers looking back to the house.