June 2: The first cuts in the dirt for the north array.

|
June 2: Almost done with the hole for the first pier.

|
June 2: Second pier had a huge rock in it...

|
June 2: But the littel Bobcat got it out! That was most
of the hole

|
June 3: After bending all the steel we started tying it
together.

|
June 3: Almost got the first cage done. Lots of little
things to do.

|
June 3: Getting it wrapped up. Dave (right) could tie steel
fater than anyone I've ever seen.

|
June 6: Steel in, conduit in, bolts in. Ready for mud.

|
June 6: Mud coming!

|
June 6: First mud in the hole!

|
June 6: About halfway full of mud.

|
June 6: Dave starting to smooth off the concrete.

|
June 6: Sean and Dave working the top of the north pier.

|
June 6: Mud going in the south pier.

|
June 6: Finishing off the top.

|
June 6: A view of both piers
looking back to the house.

|