PV Installation Photos 6
Taken between August 24 and December 3, 2005


    Notes:  The installtion had to be finished with the inverters and other components. Then some testing, and the final installation of the net meters and some looks at the PVs in operation.
 
August 24: Inverters hung, wiring trough, getting the combiner in and others.

August 24: Combiner wired, conduit brough around from the other side.

August 24: DC disconnects getting conduit and wire.

August 28: Just another nice view of the arrays and the house.

August 28: Full power test. All components in and working.

August 28: Powering up!

September 15: New net meter (left) and generator meter (right)

October 29: Shading of the arrays. This was 4:10 pm.